ACDT #86 · Spec freeze after devnet7 is final

AllCoreDevs - Testing #086 · 2026-07-06

Run one more devnet, then effectively freeze the specification.

Settled on Glamsterdam devnet-7 as the last devnet and agreed to a light spec freeze after launch. After that, only fine-tuning at the parameter level, such as gas cost constants, is allowed.

Why it matters

If devnet-7 is the last testnet, the Glamsterdam specification is effectively locked in. After that, structural changes are blocked and only minor constant adjustments are possible, so client teams will focus on stabilizing tests instead of new designs.

Decisions

Discussion

Besu instability and Prysm's FCU behavior

A segment weighing whether the cause of Besu nodes going offline in devnet-6 was Prysm's behavior of sending new payloads without an FCU.

Nimbus self-building and builder blocks

This section points out that some Nimbus nodes build blocks themselves instead of using a remote block builder, which makes it hard to find chains that use only builders.

Make devnet-7 the final one and freeze the spec

This section settles whether to confirm devnet-7 as the last devnet and how far to lock the specification afterward.

Outcome: Confirmed 00:21:51

EIP-2780 floor gas input spec test mismatch

This section raises a bug where the spec test uses a different value from EIP-2780 as the input to the floor gas calculation, proposing to fix it before devnet-7.

Glossary

EIPs covered

Forkcast record · Recording · ← Core Dev Calls